PROJECTS EXECUTED BY MCUBE POWERTECH W.L.L. IN KUWAIT
Project: Kuwait International
CLIENT: MPW / DGCA /
Airport T-4 Project
- Over 30.000 m2 of roof secondary steel installation
- 27.500 m2 of diamond shape metal panel installation
- Wall Cladding system installation including welding profile works.
Project: Construction Engineering
Client: Ministry of Defense
Construction Engineering
Project: Light Weapon Ammunition Factory Building and its Stores
- 1400 m long storm water gully concrete works.
- Execution of soak pits concrete works (Water Collection Pits).
- Interior paint works (15.000 m2).
- Interior and Exterior Concrete Topping Works (10.000 m2)
Project: Kuwait CONTRACTOR
Client: KUWAIT OIL COMPANY / North Kuwait
- 11KV/3.3KV Substation job carried through M/s. L&T at KOC/North Kuwait.
- Inclusive of all installation works like Al Ahilia Power Transformer, Switch Gear, laying of MV, LV cables, Control Cables.
- Installation of Cable ladder, Cable Tray, Support structures, Lightning protection, Earthing along with necessary civil works.
Client: JOINT OPERATION /WAFRA
- 132KV/33KV/11KV Substation job carried through M/s. L&T at Joint Operation /Wafra. Inclusive of all Installation works like 45MVA, 20MVA, 250KVA Power Transformers, 132KV/33KV GIS Switch Gear, 33KV/11KV, 11KV/430V switch gear and respective control panels.
- Laying of 33KV, 11KV, 3.3KV power cables and control cables along with civil works.
- Installation of cable ladder, cable tray, support structure, small power panel erection Lightning protection, Earthing along with necessary civil works.
- 132KV, 33KV, 11KV cable splicing and high voltage test.
CLIENTS: MEW /Mina
- Dismantling & Demolition of Complete 132/33/11KV Substation inclusive of HV, MV & LV Switchgear, Control Panel, Protection Panel, Power & Control Cables, Cable Trays, Lightings, Power Transformers, Auxiliary Transformers and Entire Building inclusive of boundary wall.
OTHER MISCELLANEOUS JOBS DONE IN KUWAIT
| SL No. | Project Name | Client Name | Consultant | Main Contractor / Contractor |
|---|---|---|---|---|
| 1 | Kuwait International Airport Terminal-4 Project (Support Terminal) | DGCA | TAEP | Cengiz Insaat & First Kuwaiti JV |
| 2 | Light Weapon Ammunition Factory Building and Its Stores | Ministry of Defense | MOD Cons. | China State Construction Engineering Corporation |
| 3 | Effluent Water Injection and Sea Water Injection Phase I and II, Abdaly – North Kuwait | KOC | M/S. Worley Parsons | M/S. Petrofac Co. / M/S. L&T |
| 4 | Construction of 132/33/11 KV GIS S.S – SUG-B.S.S Wafra | Saudi Chevron – Joint Operation | MEW | M/S. L&T |
| 5 | Dismantling and Demolition of 132/33/11 KV GIS S.S – Mina Shuaiba | Shuaiba Cement Plant | MEW | M/S. L&T |
| 6 | Fiber Optic Cable Testing | KNPC | MEW | M/S. Gulf SPIC Co. |
| 7 | Supply of Workmen | NA | NA | M/S. Arabi Enertech Co. |
| 8 | Mubrak(h) Al-Khabir Root Maintenance | AWQAF | NA | M/S. Arabi Enertech Co. |
| 9 | Routine Masque Maintenance – Jahra | AWQAF | NA | M/S. Arabi Enertech Co. |
| 10 | Meter Test System Upgradation | MEW | NA | NA |